Alert message

Login
Register now

Let op: gewijzigde openingstijden tijdens de feestdagen!

Delivery within 24 to 48 hours
Guaranty and Replacement
Safe Shopping
recommend article
recommend the following article:
“Vita” oil stain remover
Art.No. 419040

separate multiple mail address using a comma.

* mandatory fields

Details

Application Areas:

Workshops

Parking areas

Garages

Gas stations

Agricultural soil

Advantages:

  • Innovative microbiological oil stain remover
    • Highly specialized microorganisms that break down the organic compounds mix which constitutes mineral oils
    • After removal the microbiological activity continue to break down the oil adsorbed onto the surface
    • Creates a biofilm that naturally protects against further spills
  • Can be used on different surfaces
    • Tiles, concrete, agricultural soil
    • No risk of damaging the treated surface
  • Eco-friendly cleaning
    • Active microbial cultures in one nutrient solution with vegetable matter and biopolymers
    • Does not contain chemicals
    • 100% biodegradable and harmless to humans and the environment
“Vita” oil stain remover
“Vita” oil stain remover

Processing information

Remove the excess of spilled oil with paper or an oil binder
Pour the product on the oil stain and spread it with a sponge or a brush
Let it work; depending on the oil and the surface, can take up to a few days to completely remove the stain. Occasionally add some water on the stain for a faster action
For porous or very heavily soiled surfaces, renew the treatment after 3-4 days

Advice

Results and timing may vary depending on the porosity of the substrate

Technical Data

Property Value
Smell Fruity
pH-value (~) ~ 3.2
Color Brownish
Aspect Liquid
Density, at 1.04 g/ml
Water Solubility Completely miscible
Storage temperature (with predefined units) 15 °C - 20 °C
Shelf life month 24 months
Packaging Icon HDPE-02
Container Plastic bottle
Content 500 ml
Datasheets & Downloads

Productadvisor for Renewing surfaces

Berner understands the pressure of time in construction work. Challenges can occur during the whole process of structural construction, installation or finalization of a new building or renovated building.

Reviews
Compare products ()